Framed Loft

Friday
Feb132015

Interior Framing - Ice and Water Shield

Able to get ice and water shield on roof for winter and then time to fully enclose and move indoors for awhile...temporary platform built to help enclose catheral ceiling.

Thursday
Feb052015

The Addition Roof-line to Match Original Barn

After some snow melt, time to fully enclose the house....

Saturday
Jan242015

Last Floor of Addition to be added

On this last level, the loft only extends about 2/3rds of the way down.  The last section is a cathederal ceiling for the dinig area.
Friday
Jan232015

Framing Addition...Here Comes Some Snow

Although the foundation was installed prior to the ground freezing the addition framing was not....