Monday
Mar302015

The Porch Boards Are On!

The boards of the boards and batten have been added.  

Monday
Mar302015

The Insulators have Taken Over

The inside is being sprayed with foam insulation.

Wednesday
Mar252015

The Outside is Ready for Shingles!

The insulation and sheetrock will take place over the next two weeks...Time to move outside...FINALLY!

Friday
Feb272015

New Winter Sunrise View

While working over the winter it was clear there was a nice southerly view of the sunrise over the bay through the trees.  A new window was added above the dining area to maximize this view from the Master Bedroom loft. This view will also be present through the new sliding doors and backporch. (Backporch is still to be added).

Friday
Feb202015

Then it Snowed, and Snowed, and Snowed Some More...

While snow came down outside, plumbing, electrical, heat and air conditioning were roughed-in...